VERSION SCAFFMAX 2021
Description
The scaffolding can be divided into individual construction phases. To do this, new tags (= layers) must be created and the individual scaffolding elements assigned to the corresponding tags. The material list can then be sorted according to the construction phases.
Note
If you then add further elements (e.g. by manual scaffolding), these elements must also be assigned to the appropriate BA tag (see steps 6 and 7).
We recommend using the SET function to divide the scaffolding into construction phases, which offers easier and more convenient handling.
Prerequisites
- A scaffold must have been created.
Steps
- Create a new tag for each construction phase, e.g. for two construction phases, the two tags BA_1 and BA_2.
The tags must start with BA_, e.g. BA_1 or BA_North. The part after the underscore is shown in the material list (see step 10). - Click Select on the toolbar and click on a wall.
The wall is shown dotted. - Right click on the wall.
The context menu is displayed. - Select the Block wall-related scaffolding function in the context menu.
In the following dialog click on Dismantle Completely.
The automatically generated wall tags (WALL_1 etc.) are removed and the scaffolding is assigned to a newly generated FC_ tag.
Select all elements that you want to assign to the construction phase, e.g. all elements of a wall.
If necessary, switch off all tags except for the wall tags (FC_) in order to be able to select the scaffolding elements more easily.Select the appropriate tag in the default tray - Entity Info, e.g. for wall1 the tag BA_1.
Repeat steps 6 and 7 for all other construction phases.
Open the Material list.Open the Material list in the scaffmax program bar.
The sorting of the material list can be changed to structure > system.
Result
You have divided the scaffolding into individual construction phases. The material list can be sorted according to the construction phases.