Status | ||||
---|---|---|---|---|
|
Description
The scaffolding can be divided into individual construction phases. To do this, new tags (= layers) must be created and the individual scaffolding elements assigned to the corresponding tags. The material list can then be sorted according to the construction phases.
Hinweis | ||
---|---|---|
| ||
If you then add further elements (e.g. by manual scaffolding), these elements must also be assigned to the appropriate BA tag (see steps 6 and 7). |
Info |
---|
We recommend using the SET function to divide the scaffolding into construction phases, which offers easier and more convenient handling. |
Prerequisites
- A scaffold must have been created.
Steps
- Create a new tag for each construction phase, e.g. for two construction phases, the two tags BA_1 and BA_2.
The tags must start with BA_, e.g. BA_1 or BA_North. The part after the underscore is shown in the material list (see step 10). - Click Select on the toolbar and click on a wall.
The wall is shown dotted. - Right click on the wall.
The context menu is displayed. - Select the Block wall-related scaffolding function in the context menu.
In the following dialog click on Dismantle Completely.
The automatically generated wall tags (WALL_1 etc.) are removed and the scaffolding is assigned to a newly generated FC_ tag.
Select all elements that you want to assign to the construction phase, e.g. all elements of a wall.
If necessary, switch off all tags except for the wall tags (FC_) in order to be able to select the scaffolding elements more easily.Select the appropriate tag in the default tray - Entity Info, e.g. for wall1 the tag BA_1.
Repeat steps 6 and 7 for all other construction phases.
Open the Material list.Open the Material list in the scaffmax program bar.
The sorting of the material list can be changed to structure > system.
Result
You have divided the scaffolding into individual construction phases.The material list can be sorted according to the construction phases.